A timber frame, first
The core CairnHaus room is a timber frame. That frame carries the roof. Insulation — wood fibre or hemp — sits within it. Hemp, whether as batts or later as hemp-lime, is not the structure.
Materials
We describe the materials we use, plainly. We do not claim a room is carbon-negative, zero-carbon or fully sustainable.
The core CairnHaus room is a timber frame. That frame carries the roof. Insulation — wood fibre or hemp — sits within it. Hemp, whether as batts or later as hemp-lime, is not the structure.
We insulate with wood-fibre or hemp because both are vapour-open plant-based materials that work with a timber frame. You can choose either in the same wall build-up.
On the west coast, driving rain is the real test. The default wall has a drained, ventilated cavity behind a Scottish larch rainscreen — not a render applied directly to the wall.
Rooms are made to order as 1.2 m wall modules, then assembled on your plot. We start from a site visit, not a one-size catalogue promise.
The rooms
All three share the same cassettes and the same default envelope. The difference is the roof and the garden front. Typical sizes are 3×3, 3×4 (the usual starting point) and 4×5.
Illustration — the Studio, the flagship 3×4.
The flagship
A shallow roof and a glazed garden front. This is the default 3×4 plan: a year-round room with a French-door opening to the garden and a side window.
From £[XX,XXX]
A typical 3×4 Studio, as a starting figure only. The base and any upgrades are quoted separately. A written quote follows a site visit.
Illustration — the Bothy.
A mono-pitch roof, high side to the garden, and one tall window. The simplest silhouette, on the same timber-frame kit.
Illustration — the Sedum, an upgrade rather than a different structure.
The Studio or Bothy with a planted roof. We check the load, especially on the ground screws, before we specify it.
Upgrades and the base
Hung slate, sandstone slips and a sedum roof bolt onto the same rainscreen battens and roof deck. The default base is ground screws.
Welsh or Spanish slate, hung on the same battens as the larch. A traditional west-coast rainscreen. Scottish slate can be quoted if it is available.
Thin natural sandstone on a drained cavity — the Vale look against the garden. The frame and the base need to be designed for the extra weight.
A planted roof on a stronger, root-protected deck. We check the load before we offer it, including on the screw layout.
The usual base: typically installed in a day, with no concrete, and reversible. The floor can often go on the same day. Other bases are used if the plot needs them.
Lean-tos, conservatories, orangeries, garages and smaller outhouses can follow the same panel idea. Other prefab garden rooms are also available through partners. We do not name those partners here; we will talk them through with you if that is a better fit than a CairnHaus build.
How it works
You sign nothing on the first visit. A written specification and quote come next, for your site.
We look at the plot, access, and whether the room is likely to sit inside Scottish permitted development rules. Designed to fit those rules where possible; we check every site.
Size, variant, upgrades and the base, priced for your garden. The figures on this page are starting placeholders, not a quote.
Typically ground screws, often in a day, then the floor can go on. Pads or a slab are used where the site needs them, and they need time to cure.
The room arrives as prefabricated cassettes and is assembled on the base, typically over two to four days after the base is ready.
Snagging, the electrical certificate, and a short care note for the larch, the lime and any sedum.
As a typical guide only: design and survey often take one to two weeks. After a cleared materials deposit, a typical programme is eight to sixteen weeks to handover. We are now booking spring and summer 2027 slots. Your written quote will set out the programme for your job.
FAQ
The rooms are designed to fit Scottish permitted development rules where possible; we check every site. We do not guarantee that no planning application is needed. Conservation areas, listed buildings, flats, a building used as a separate dwelling, or a slope that pushes the height over the limit can all change the answer. If you want it in writing, we can help you apply for a certificate of lawfulness.
No. Planning and a building warrant are separate in Scotland. A typical 3×4 detached room with no toilet or stove, kept the right distance from the house and the boundary, often needs no warrant — but it must still meet the building standards. A toilet, a fixed stove, sleeping use, an attached room, or a larger footprint can mean a warrant is required. We check every site.
The default is a ground-screw base: typically installed in a day, with no concrete, and reversible. Concrete pads or a slab are used if the ground, the load or the way the room meets the house needs them. The base is quoted separately from the room.
These are typical guides, not a promise. Design and survey often take one to two weeks. After a cleared materials deposit, a typical programme is eight to sixteen weeks to handover. Once the base is ready, assembly on site is typically two to four days. We are now booking spring and summer 2027.
Prices on this page are shown as From £[XX,XXX] until confirmed. That is a starting placeholder for a typical 3×4 Studio, not a fixed quote. Upgrades and the base are extra. A written quote follows a site visit.